Current projects

Customer Subject of contract Commencement date Completion date
1 SI “Directorate of energy, housing and utility sector of the Atyrau region” “Construction of “Ushtobe” gas distribution station and high-pressure gas pipeline with a hydraulic fracturing installation in the Almaty region” 23.02.2018 Being currently implemented
2 SI “Directorate of energy, housing and utility sector of the Atyrau region” “Construction of “Saryozek” gas distribution station and high-pressure gas pipeline with a hydraulic fracturing installation in the Almaty region” 23.02.2018 Being currently implemented
3 SI “Directorate of energy, housing and utility sector of the Atyrau region” Construction of gas distribution networks in Taldykorgan city Stage III (construction of start-up facility 13) 23.02.2018 Being currently implemented
4 SI “Directorate of energy, housing and utility sector of the Atyrau region” Строительство газораспределительных сетей г. Талдыкорган» III-очередь, строительство 13-го пускового комплекса 23.02.2018 Being currently implemented
5 “KazTransOil” JSC “Tengizchevroil” LLC Design, procurement, construction and commissioning of “Kulsary-Tengiz” water conduit 22.01.2018 Being currently implemented
6 North Caspiam Operating Company N.V. (NCOC) Construction of 60-apartment 3-storey residential building in Kadyrk village of Kurmangazinsky district 05.02.2018 Being currently implemented
7 “Transtelekom” JSC Replacement of the pipeline at the section of the RD GOS Kigach-0 km, 0-56km, Du=1220mm of the Astrakhan-Mangyshlak water conduit 17.08.2018 Being currently implemented